Posted in renovations..
We have been boxing things up from the entire main floor and moving as much as possible to the basement. It initially started because the livingroom would house the new cabinets until the install but then when we decided to do ALL the flooring, it just seemed prudent to move as much as possible down here. Wow, is it tight! LOLIn addition to all the moving of things, the gazillion walls (really only 10) of wallpaper are being stripped, the walls washed and prepped for priming and painting, and a temporary kitchen set up. Most of that is now done so the plan is to do the priming before the cabinets and flooring go in. We feel quite ready in spite of the fact that our cabinets arrived about 3 weeks early and so the dates for everything are moving up. It's really getting quite exciting!
Dee..