Posted in renovations..
Morning dawned bright and early. We were up doing last minute prep to the areas that were getting subfloor installed. The installer was to arrive between 10 and 11am and at 10:57am he called to let us know he was on his way. He arrived and got started by 11:30am and by 4pm the kitchen, hallway, and two bedrooms had nice new subfloor. Tonight we had to move an adjustable bed and that was the thing we were really NOT looking forward to. When we got it, the delivery people took almost an hour to get it into our cozy master bedroom so we were afraid we wouldn't be able to get it out ourselves. However, a rolling platform helped considerably and it was done in a fraction of the time it took those delivery people five years ago. :) So, tonight we will sleep in our kitchen! LOL Our son will also sleep on a mattress on the floor while our daughter will sleep on the loveseat in the basement. What a memory this will be!Tomorrow will be a very busy day. We have the all the rest of the subfloor other than the livingroom (which is full of cabinets and appliances) going in and the sheet vinyl being installed in the three bedrooms. We also have a plumber and an electrician coming to reroute water and drainage lines, and to finish installing the new electrical plugs, etc. The fellow that is doing the bathroom is arriving to tear out the old fixtures so subfloor can go in there. And if that isn't enough, the new fixtures for the bathroom are being delivered as well.
Dee..